Sustainable Construction Evidence Base
This page contains the evidence base on sustainable construction related topics that inform the Local Development Framework.
Balance Trading Feasibility Study
Balance Trading is a new policy instrument being developed by eaga plc. This would enable the net carbon emissions from new housing development to be offset by providing for S106/tariff funded investment (or direct contributions) via a Local Carbon Reduction Fund to finance energy saving installations and the application of renewable technologies to eco-retrofit nearby neighbourhoods.
The project draws on a recently completed research project to assess the requirements of establishing a Low Carbon Reduction Fund, carried out for the borough by the Energy Centre for Sustainable Communities.
Redhill Landfill Gas Combined Heat and Power District Heating Project
A study was undertaken in 2004 to assess the feasibility of creating a district heating system in Redhill to be provided with renewable heat from existing landfill gas engines on the Biffa Waste Services site.
- Redhill Landfill Gas CHP/DH Project: Options Appraisal 2004
- Redhill Landfill Gas CHP/DH Project: Plan
- Redhill Landfill Gas CHP/DH Project: Options Appraisal Appendix B - Load Profiles.
Redhill Town Centre Developement CHP Screening Analysis
This document provides a an outline feasibility study of installing a combined heat and power scheme to supply electrical power and district heating to the proposed Redhill town centre development.
Coppice and Wood Fuel Supply Chains
The following studies have been undertaken to assess the potential for short rotation coppice planting in Horley and a wood supply chain.
- Potential for Short Rotation Coppice Planing in Riverside Green Chain at Horley 2007
- Wood Fuel Supply Chain Design Study 2008
- Gatwick Diamond Woodfuel Supply Chain 2009
- Gatwick Diamond Supply Chain - Draft Action Plan 2009.
Local Carbon Reduction Fund Study 2008
In 2008 a study was undertaken by the Energy Centre for Sustainable Communities (ecsc) to establish the feasibility of developing and implementing a Local Carbon Reduction Fund.
- Local Carbon Reduction Fund Study Report
- Appendix 1 - Review of existing offset funds
- Appendix 2 - Community projects summary
- Appendix 3 - Housing projects summary
- Appendix 4 - Assessment of additional and added value
- Appendix 5 - Collated business interview note
- Appendix 6 - RBBC fund checklist
- Appendix 7 - Project example - community regeneration
- Appendix 8 - Project example - domestic energy efficiency
- Appendix 9 - Project example - schools renewable energy
Appendix 10 - Project example - biomass for schools example.
Sustainable Construction Implementation Evidence Document
This document recommends steps that would need to be taken if the Council were to implement a Sustainable Construction Policy within the Core Strategy.
Last updated : 06/04/2010